Tub & shower re-caulking
All transition seams removed, cleaned, primed and resealed with mould-resistant silicone
From $95
Get exact quote →Bathroom renovation · Calgary
Vanity installation, toilet replacement, exhaust fan swap, re-caulking, tile repair and painting. Steve personally does every task — no crew, no subcontractors — with a written quote before anything is scheduled.
Send photos of the bathroom and a list of what needs changing. Most bathroom refresh quotes are confirmed same-day.
Tub & shower re-caulking
All transition seams removed, cleaned, primed and resealed with mould-resistant silicone
From $95
Get exact quote →Toilet replacement
Old toilet removed, new toilet set, wax ring, supply line, seat installed — toilet supplied by you
From $225
Get exact quote →Exhaust fan swap
Like-for-like replacement: disconnect, remove old unit, install new fan, reconnect wiring, test airflow
From $195
Get exact quote →Vanity installation
Old vanity out, new vanity set and levelled, supply lines and drain connected, perimeter sealed
From $350
Get exact quote →Tile repair
Remove cracked or loose tiles, re-adhere with thin-set, regrout to match, seal grout after cure
From $120
Get exact quote →Full bathroom refresh package
Vanity + toilet + exhaust fan + re-caulk + paint — quoted together as a combined scope
From $850
Get exact quote →Replacing a vanity transforms a bathroom more than any other single task. We remove the old unit, disconnect supply lines and P-trap, set the new vanity on level shims, reconnect or replace the supply lines and drain assembly, install the faucet if it comes separately, and seal the perimeter with mould-resistant silicone. Calgary's hard water (170–200 mg/L) means we check the shut-off valves while we have them exposed — a seized shut-off discovered during a future emergency is a serious problem.
A toilet upgrade is one of the highest-value handyman tasks per dollar spent. We shut off supply, drain and remove the old toilet, replace the wax ring, set the new toilet, install the supply line, mount the seat and run a full flush cycle test. Low-flow models (4.8 L/flush or dual-flush) are standard under Alberta's building code for new installations — we advise if your chosen model meets the requirement.
Bathroom exhaust fans in Calgary homes typically have a 10–15 year service life before the motor becomes noticeably loud or the airflow drops below the minimum 50 CFM required by code. A like-for-like swap is a 90-minute job: cap the circuit, remove the old unit, install the new fan in the same housing or expand the housing if upsizing, reconnect wiring and test. Bathroom Air King, Delta Breez and Broan fans are all common brands we install.
Caulk at the tub-to-wall and shower floor-to-wall transitions is the primary water barrier stopping moisture from entering the wall cavity. Calgary's temperature cycling causes more joint movement than milder climates — caulk here fails faster, typically showing cracks or pulling away at 3–7 years. We remove all old caulk mechanically, clean the joint with a mould inhibitor, prime the substrate and apply a mould-resistant silicone in a continuous bead without gaps.
Cracked tiles in a shower or around a tub are not just cosmetic — a failed tile lets water behind the substrate. We remove the damaged tile without disturbing adjacent tiles, assess the substrate for moisture damage, re-adhere with appropriate thin-set, regrout to match the existing colour as closely as possible and apply penetrating sealer after 72-hour cure. For widespread grout discolouration, full regrouting of a tub surround is a one-day job.
Bathroom painting requires an eggshell or satin sheen for moisture resistance — flat paint is inappropriate in a wet room. We use mould-resistant bathroom paint and apply two coats after filling nail holes and caulking the baseboard-to-floor joint. Towel bars, toilet paper holders, hooks and mirrors are installed with the correct anchors for tile or drywall — a toggle that pulls out behind the tile is a common failure we see and fix.
Doing bathroom tasks in the wrong sequence means redoing work. Here is the correct order:
You purchase the vanity — we install it. This way you choose the exact style, size and finish without a contractor markup. We disconnect the old unit, remove it, set the new vanity, connect the supply lines and drain, install the faucet if included, seal the perimeter and leave the work area clean. Common sources: IKEA, Home Depot, Wayfair, local plumbing showrooms.
A full bathroom refresh — vanity, toilet, exhaust fan, re-caulk and paint — typically takes 2 days. Day one covers the larger installations (vanity, toilet, fan); day two covers painting, caulking and accessories once the silicone from day one has cured. Calgary's dry climate (15–25% RH in winter) speeds up silicone and paint cure times significantly.
Full shower retiling is outside our scope — that involves waterproofing membrane work that should be done by a certified tile setter. What we do handle: individual cracked or loose tile replacement, regrouting, and re-caulking at all transitions (floor-to-wall, tub-to-wall, corner seams). These repairs address the most common failure points without a full retile.
Caulk is the flexible sealant used at movement joints — where the tub meets the wall, floor meets the wall, and inside corners. It flexes with the building and prevents water intrusion at joints that move. Grout fills the static joints between tiles. Calgary's temperature swings cause more joint movement than milder climates, so caulk at transitions fails faster here — typically 3–7 years. Regrouting is needed when grout cracks, crumbles or discolours throughout a tiled area.
A like-for-like exhaust fan replacement — same size opening, existing wiring and duct in place — does not require an electrician in Alberta for a handyman doing the mechanical swap. We cap off the power, swap the fan unit, reconnect the wiring to the same junction and test airflow. If you are adding a new fan where none existed, or rerouting ductwork, that changes the scope and may require an electrician and permit.
Individual tasks: re-caulking from $95, toilet replacement from $225, exhaust fan swap from $195, vanity installation from $350, tile repair from $120/section, painting from $185. A combined bathroom refresh package (vanity + toilet + exhaust fan + caulk + paint) typically runs $850–$1,400 depending on scope — a fraction of what a contractor-managed renovation costs.
Not satisfied with the work? I will come back and make it right.
Get a bathroom renovation quote or call (403) 973-5123