The 10-step Calgary bathroom renovation sequence
| Step | Work | Who |
|---|---|---|
| 1 | Demolition — fixtures, tile, flooring, vanity | Handyman or homeowner |
| 2 | Rough plumbing (only if moving drain/supply locations) | Licensed plumber |
| 3 | Rough electrical (only if adding circuits or GFCI) | Licensed electrician |
| 4 | Substrate repair and waterproofing (cement board, RedGard) | Handyman or tile contractor |
| 5 | Shower and wall tile installation | Handyman or tile contractor |
| 6 | Floor tile installation | Handyman or tile contractor |
| 7 | Grout all tile and allow cure (24–48 hrs) | Handyman or tile contractor |
| 8 | Vanity, toilet, faucet, and fixture installation | Handyman (no plumbing location change) |
| 9 | Electrical devices — GFCI, light fixture, exhaust fan | Handyman (like-for-like) or electrician |
| 10 | Paint, trim, caulk, accessories, and touch-ups | Handyman or homeowner |
Permit thresholds in Calgary bathrooms
- No permit required: like-for-like vanity, toilet, faucet, tile cosmetic replacement (no moving plumbing or structural work)
- Plumbing permit required: moving a drain location, adding a new supply line, new shower rough-in
- Electrical permit required: new circuit, adding an outlet where none exists, new exhaust fan on a new circuit
- Building permit required: moving walls, changing window openings, structural modifications
Moisture assessment before tiling over existing tile
Before tiling over an existing substrate — whether the old tile is being removed or new tile is going over it — assess for substrate moisture damage:
- Probe the wall with a screwdriver in corners and at the tub/floor junction — soft or crumbling material means moisture has penetrated
- Test floor deflection by pressing the subfloor — any springiness indicates subfloor softening
- Look for brown grout staining — indicates water has been passing through grout lines for an extended period
Calgary's low winter humidity means that a compromised shower substrate can dry between uses enough that the moisture damage is not visible until a renovation exposes it. Discovering wet substrate after tile is ordered is the most common project delay in Calgary bathroom renovations.
Handyman bathroom renovation scope (no plumbing relocation)
- Demolition of existing tile, vanity, toilet, and accessories
- Cement board installation (shower walls and floor substrate)
- Wall and floor tile installation and grouting
- Vanity cabinet and countertop installation
- Toilet removal and reset (at same drain location)
- Faucet and fixture installation (at existing supply locations)
- Shower door installation
- Mirror and medicine cabinet installation
- Exhaust fan swap (like-for-like at existing box)
- GFCI outlet and light fixture replacement (like-for-like)
- Painting and trim installation
- Caulking all joints and final silicone work
Bathroom renovation in Calgary
We handle the full handyman scope — demolition through trim and caulking — and coordinate licensed trade referrals when plumbing or electrical changes are needed. Tell us the scope and we provide a detailed quote.
View faucet and fixture service →Bathroom refresh for pre-listing prep →Request a bathroom renovation quoteSteve serves all Calgary areas